Skip to content
Projects

Structure the work.

Group jobs into a project, split a job into parts, and bill each part as it finishes.

Run bigger jobs.

Structure your first project in minutes.

Group

Jobs under a project

One place for a site or a build — every job on it, and one set of totals across the lot.

Add many jobs
Per-block breakdown
One progress bar
Riverside development
18 jobs · 12 active
Boiler install — Flat 16/6
Bathroom refit — Flat 43/8
Communal boiler1/5
Split

A big job becomes sub-jobs

One per stage or area. Each is a real job — its own job sheet, costs, photos and team.

Its own sheet and its own costs
A different team on each part
Finish one without waiting for the rest
Rear extension — The Whitfields5 parts
1GroundworksDone
Job sheet · 6 tasks12 photos
2Shell & roofIn progress
Job sheet · 9 tasks4 of 9
3First fixNot started
Bill

Multi-job, one Quote!

Price every part, send one document. The customer sees each part in full — every material, every quantity — and one total at the bottom.

The sections are the sub-jobs, not headings typed by hand
Summarised by cost type, or itemised down to the block count
Accepted quote becomes the invoice, sections and all
Roll up

Costs climb the tree

Estimate, committed and actual at every level. Margin is live, not a month-end spreadsheet.

Actuals land against the part that spent them
The job totals itself
Project profit without rebuilding it by hand
Costs — Rear extensionMargin 26%
1Groundworks£4,510.00
2Shell & roof£11,290.00
3First fix£5,672.00
Job total£21,472.00
£Quoted£29,000.00

Bigger work, still under control

Some work is one visit; some is an extension that runs for three months. A project groups related jobs, and any job splits into sub-jobs — one per stage or area — so the shape on screen matches the shape of the work. Each sub-job is a real job with its own job sheet, its own costs, its own photo evidence and its own team.

One quote, a section per part

Price each part and generate the quote from the job: one document, a section per sub-job, each with its own total. The sections come from the work rather than being typed in as headings, so the document can't drift from what you're actually building. Accept it and the invoice carries the same sections through — the customer checks the document they already agreed to.

Rolled-up financials and evidence

Costs run the other way. Actuals land against the part that spent them, the job totals its parts, and the project totals its jobs — estimate, committed and actual at every level. Photo evidence follows the same shape, so a handover pack assembles itself in the order the work happened.

Common questions

Last updated