Skip to content

Oil heating certificates

The CD/10, CD/11, CD/12 and CD/14 forms and the oil tank risk assessment.

These certificate forms are for UK organisations only. Versions for other countries are not currently available.

The six oil forms

Each is started from the job.

Oil installation completion reportCD/10A new or replacement appliance, tank or supply, installed to the standards.
Oil boiler service and commissioning reportCD/11A service, commissioning, breakdown or warranty visit.
Landlord oil installation checkCD/12The yearly check of an oil installation in a rented home.
Oil warning noticeCD/14A risk found on an installation. Signed by the person responsible, issued from the web app.
Oil tank risk assessmentTI/133DWhether a tank needs secondary containment or fire protection.
Condensing oil boiler assessmentCD/30Whether a non-condensing boiler may be fitted in an existing home.

Gas certificates

A service and commissioning report as Jobivo issues it

Sample service and commissioning report with made-up details, marked DRAFT
  1. 1Call typeService, commission, breakdown, warranty or return visit, ticked across the top.
  2. 2Appliance and burnerThe boiler, burner, tank, flue and fuel.
  3. 3Test resultsPump pressure, carbon dioxide, flue gas temperature, efficiency and smoke number.
  4. 4Service scheduleFifteen items, each marked checked and passed, with parts fitted beside them.
  5. 5Serial numberCD11, the year and your company's running number.

A sample with made-up details: a yearly boiler service. A report carries DRAFT until it is issued. The registration boxes are blank here; yours are filled from the numbers you keep on file.

The rules oil forms answer to

After a service

The technician completes a service and commissioning report for the customer's records, with the work done, the combustion results and any parts replaced.

OFTEC: paperwork issued for servicing ↗

At commissioning

The same report is completed when an appliance is commissioned.

OFTEC: paperwork issued for commissioning ↗

Installation work

It must be notified to building control in England and Wales. A registered business can self-certify through a competent person scheme.

OFTEC: frequently asked questions ↗

What is on a service report

Call type
What kind of visit it was.
Appliance and burner
The boiler, burner, nozzle, tank, flue and fuel.
Test results
The combustion readings and the analyser used.
Service schedule
Fifteen items, from oil storage to the carbon monoxide alarm.
Comments
Anything the customer needs to know.
Sign off
The next service date, who received the report and their signature.

What the oil forms do for you

  • An oil form cannot be issued until the technician's OFTEC number is on file.
  • The tank risk assessment works out whether secondary containment and fire protection are needed from your answers.
  • The installation completion report only asks about the work you did: tank, supply, appliance, flue or controls.
  • A warning notice records each fault as a potential or an immediate risk. It is issued from the web app with the recipient's signature.

Filling it in on the phone

The same forms are in the web app.

The oil service and commissioning report on a phone, with the technician's OFTEC number and its sections
A service report: your OFTEC number, then its sections.
The first section of the oil service report with the call type ticks
The kind of visit, ticked.
The appliance fields of the oil service report with the Pick or add button
The appliance, picked from the property's list or added.

After it is issued

A signed PDF

Digitally signed when issued. Changing the file breaks the signature.

A QR code and an online copy

The QR code on the report opens its online copy. No account is needed to read it.

Serial number

CD11-2600076: the code, the year and your company's running number.

Send it

Share the PDF or copy the link from the phone. Add it to the job's invoice and it goes out with the invoice email.

On the certificates register

Listed with its next service date. It reads Due from the day that date arrives.

Issued when the job is completed

A finished draft on a completed job is issued for the engineer who filled it in.

How certificates work in Jobivo

Try Jobivo free for 14 days.

No card required. Set up in minutes.

CD/10 or CD/11

The completion report is for installation work: a new or replacement appliance, tank or oil supply. The service and commissioning report is for every visit after that, and for commissioning the appliance once it is installed.

Common questions

Which oil forms can I issue?

Six: the installation completion report (CD/10), service and commissioning report (CD/11), landlord oil installation check (CD/12), warning notice (CD/14), tank risk assessment (TI/133D) and condensing boiler assessment (CD/30).

Do I need an OFTEC number?

Yes. An oil form cannot be issued until the technician's OFTEC number is on file. The company's registration is printed on the form.

When is a tank risk assessment done?

When an oil tank is installed or assessed. The form asks eleven spillage questions and six fire questions and works out the two answers.

Can I do gas and oil forms in the same app?

Yes. Both come with the Gas, Plumbing and Heating industry setting.

Last updated